logo
Contact

How to plan power and network for colocation

Quote colocation power and connectivity using measured draw, redundant PSUs, ports, transfer, IP addressing, remote access and growth requirements.

Updated 7/30/20264 min read

Size power

PSU rating is not constant draw. Provide PSU count, connectors, normal use, measured peak and startup behavior so capacity and redundancy can be checked.

Related guide: Server requirements for Housing and colocation

Define connectivity

Specify port speed, expected transfer, traffic direction, IPv4/IPv6 and special VLAN or routing needs. Fast ports do not imply unlimited transfer.

Quote inputs
Define connectivityInputReason
PortRequired speed and duplexCompatibility and capacity
TransferAverage, peak and directionPlanning and policy
AddressesCount and IP versionAllocation and routing

Prepare remote operations

Use out-of-band management when available and define who may request a reboot or intervention. Document authorization and maintenance windows.

Frequently asked questions

Is PSU wattage enough for a quote?

No. Capacity rating differs from real draw. Provide measured normal and peak use, PSU count, connectors and growth.

Does a 1 Gbps port mean unlimited traffic?

Not necessarily. Port speed, included transfer and acceptable-use policy are separate terms.

Sources

  1. inetHost — Housing Colocation
  2. inetHost — Terms of Service
How to plan power and network for colocation | inetHost